#1  
8th January 2019, 02:28 PM
Unregistered
Guest
 
Posts: n/a

Course structure of ME(Construction Engineering and Management) in University Visvesvaraya College of Engineering, Bangalore?


Hi friends, I just want to know about the structure of ME(Construction Engineering and Management) course which is available in University Visvesvaraya College of Engineering, Bangalore. Can you please provide me the course structure asap.




  #2  
15th January 2019, 06:52 PM
shahi jee
Senior Member+++++
 
Join Date: Jul 2017
Location: Bihar
Posts: 5,804
Default Re: Course structure of ME(Construction Engineering and Management) in University Visvesvaraya College of Engineering, Bangalore?

Course structure of ME (Construction Engineering and Management) in University Visvesvaraya College of Engineering, Bangalore are mentioned below:-
Course Duration - 2 years
Course Type - Degree
Course Level - Post-graduation
Course Mode - Regular
Course Place - On Campus
Eligibility - Passed BE/ B.Tech/ B.Sc with at least 55% aggregate

Syllabus -
Semester 1 - Construction and Planning
Contracts, Administration and Arbitration
Life Cycle Costing of Infrastructures
Irrigation Water Distribution Systems
Laboratory Practice I

Semester 2 -
Construction Methods and Equipment Management
Safety Management in Construction
Advanced Concrete Technology
Environment and Energy Management
Laboratory Practice II

Semester 3 -
Seminar
Projects Stage I

Semester 4 -
Progress Seminar
Projects Stage II
Do you have any question? or have anything to say?



Related Topics:

Thread Replies Last Post
Eligibility to study ME(Construction Engineering and Management) in University Visvesvaraya College of Engineering, Bangalore? 3 15th January 2019 09:40 PM
Fee structure of ME(Construction Engineering and Management) offered in University Visvesvaraya College of Engineering, Bangalore? 1 14th January 2019 09:48 PM



Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.3.0
vBulletin Optimisation by vB Optimise.
Please also check: