#1  
6th December 2020, 05:04 PM
Unregistered
Guest
 
Posts: n/a

Course syllabus of MTech(Industrial Pollution Control Engineering) in Thapar Institute of Engineering and Technology?


Dear friends, kindly help me to know about the syllabus of MTech(Industrial Pollution Control Engineering) course of Thapar Institute of Engineering and Technology. I am planning to do this course so I want to know about the course syllabus.




  #2  
27th December 2020, 12:14 AM
cookie1902
Senior Member+++++
 
Join Date: Jan 2019
Posts: 12,120
Default Re: Course syllabus of MTech(Industrial Pollution Control Engineering) in Thapar Institute of Engineering and Technology?

MTech in Industrial Pollution and Control Engineering is a 2 year duration course. This course gives learning to a variety of chemical, physical, biology treatment processes related to industrial pollution control. The detailed syllabus is given below.

Advanced Numerical Methods
Industrial Waste Water Management
Advanced Transport Phenomena
Industrial Pollution Control Engineering
Process Modelling and Simulation
Environmental Law and Policy
Industrial Biotechnology
Advanced Chemical Reaction Engineering
Advanced Biochemical Engineering
Design of Air Pollution Control Engineering I
Advanced Thermodynamics
Environmental Management
Environmental Legislation, Audit and Impact Assessment
Instrumentation For Environmental Analysis
Energy Engineering
Industrial Safety Management
Separation Processes
Design of Water Systems
Hazardous Waste Management
Optimization of Chemical Processes
Industrial Pollution Control Engineering II
Seminar
Project Work
Do you have any question? or have anything to say?



Related Topics:

Thread Replies Last Post
Minimum marks or rank in aieee to get admission in dce? 307 21st March 2015 03:15 PM
Any reservations for girls in AIEEE? Minimum marks or Rank required? 38 7th May 2013 01:01 PM



Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.3.0
vBulletin Optimisation by vB Optimise.
Please also check: