How may I do training at Koradi power plant? I'm doing B.Tech from VNIT Nagpur with branch Power pant engineering
Hello.
|
#2
15th June 2012, 12:03 PM
|
|||
|
|||
![]()
hai
I am not experienced in this field.But i have collected the details about training in KTC. This training Methodology involves: Class room lectures Actual demonstrations at power plant Visit to manufacturers/works of BHEL/I.L.Palghat Visit to 500 MW unit chandrapur TPS/Pophali Hydro P.S/Gas P.S.Uran/HVDC Padghe and L.D center,Nagpur A.V.lessons,video cassettes and C.B.T Packages Group discussions and case studies Computer awareness Simulator training Preentation by trainees Evaluation through written/oral exams |
#3
4th February 2013, 08:18 PM
|
|||
|
|||
![]()
i want to joi KTC as a trainee ..what is the procedure ? and is there any fees vis a vis this task??
|
#4
5th February 2013, 08:45 PM
|
|||
|
|||
![]()
Hi. Thanks.
Last edited by Apourv Patinge; 21st June 2020 at 07:13 PM. Reason: Thanks |
#5
8th November 2013, 12:12 AM
|
|||
|
|||
![]()
I am 3rd year engineering student.Is there any training programme for vacations fot maximum 15to 20 days?How will I get information about that?
|
#6
1st May 2014, 09:15 PM
|
|||
|
|||
![]()
Hi,I am abhishek meshram ,B.tech 2nd year student.I want to do training at koradi powerplant .Just tell me the procedure how can i step into this plant.Please send me fees details and training period module at [email protected]
thank you |
#7
20th October 2015, 01:00 PM
|
|||
|
|||
![]()
I AM siddhes jain doing Btech chemical engineering. Im a 2nd year student studying in VIT vellore tamil nadu. I want to do training in koradi power plant for 15 to 20 days.soo plzz tell me the procedure i shoul follow. I want it to b in month of December. Plzz send me feel details and all. My mail id is [email protected]
|
#8
20th October 2015, 07:57 PM
|
|||
|
|||
![]()
I am siddhesh jain Btech 2nd year doing chemical engineering in VIT vellore tamil nadu. I want to do training in koradi power plant for 15 to 20 days. Can u tell me the fees structure and procedure i should follow to apply for it. Please send me all the details regarding it on [email protected]