22nd March 2011, 09:31 PM
ajeesh anirudhan
Junior Member
 
Join Date: Mar 2011
Posts: 1

Model question papers fo RRB exam?


please send me some model qustions for rrb examination

Please reply

thanks




 
25th March 2011, 01:32 AM
melwynjensen
Senior Member+++++
 
Join Date: Jan 2011
Location: Chennai
Posts: 3,213
Smile Re: Model question papers fo RRB exam?

Quote:
Originally Posted by ajeesh anirudhan View Post
please send me some model qustions for rrb examination

Please reply

thanks
RRB ( Railway Recruitment Board ) EXAM MODEL PAPERS


Attached some of the previous year model question papers of RRB exam in this post.. kindly check it over.. hope it helps for your preparation..

POINTS TO NOTE :

-> RRB exam consists of 4 different sections 1) General Arithmetic 2) Analytical and Quantitative skills 3) General Awareness 4) English/Hindi as Language.

-> To study the first 2 tops online CLICK HERE!!!
Attached Files
File Type: zip RRB.zip(2.55 MB, 2520 views)
 
3rd April 2011, 10:44 AM
kguru.ece
Junior Member
 
Join Date: Jul 2010
Location: Chennai
Posts: 71
Thumbs up Re: Model question papers fo RRB exam?

Model Question Paper For RRB Exam :

1. The bent-up length of rail used in front of nose of crossing which help in channelising the train wheels in their proper routes are known as:
(a) lead rail (b) point rail (c) wing rail (d) splice rail
Ans:- C
2.The point up to which the new railway track laid, at any time is called:
(a) terminal (b) station (c) rail-head (d) base
Ans:- C
3.The good quality wood for sleeper is:
(a) Deodar (b) Sheesham (c) Teak (d) Sal
Ans:- C
4.Generally the life of wooden sleepers is taken as:
(a) 2 to 3 years (b) 12 to 15 years
(c) 35 to 50 years (d) 5 to 8 years
Ans:- B
5.The gradual or tapered widening of the flangeway which is formed by bending and splaying the end of check rail or wing rail away from the gauge line is known as:
(a) Flare (b) Toe (c) Heel (d) Loop
Ans:- A
6.The minimum height of embankment above the highest flood mark in the area should be:
(a) zero cm (b) 30 cm (c) 100 cm (d) 60 cm
Ans:- D
7.The recommended depth of ballast cushion on a curved portion of a track is provided under the ........ edge of the sleeper.
(a) upper (b) middle (c) inner (d) outer
Ans:- C
8. An outward slope provided on the tread of the wheel is:
(a) 1 in 5 (b) 1 in 10 (c) 1 in 20 (d) 1 in 25
Ans:- C
9.The granular material spread on the formation of a railway track for the sleepers to rest upon is known as:
(a) anchors (b) ballast (c) subgrade (d) chairs
Ans:- B
10.Bone shaped section of fish plate is commonly used for connecting:
(a) double headed rails (b) flat footed rails
(c) bull headed rails (d) all above are correct
Ans:- B
11.The members laid transversely under the rails for supporting and fixing them at the gauge distance apart are known as:
(a) fastenings (b) sleepers (c) ballast (d) fish plate
Ans:- B
12.The bottom width of foot in a flat footed rail is:
(a) 78.6 mm (b) 136.5 mm (c) 66.7 mm (d) 70 mm
Ans:- B
13.The rectangular pits in which wheels of the locomotives are taken out for repairs, are known as:
(a) Track pits (b) Inspection pits
(c) Drop pits (d) Siding pits
Ans:- C
14. The wheels are coned to prevent from rubbing the inside face of the rail head and to prevent lateral movement of the axle with its wheels. The slope of cone is:
(a) 1 in 5 (b) 1 in 20 (c) 1 in 10 (d) 1 in 15
Ans:- B
15. Gauge is the distance measured in place of the between which faces of two parallel rails in a track.
(a) inner faces
(b) centre line of one rail to inner face of other rail
(c) centre lines (d) outer faces
Ans:- A
16. Most significant which imposes limitations in raising the high speeds is:
(a) adhesion of wheels (b) resistance due to oscillations
(c) flange resistance (d) air or wind resistance
Ans:- A
17. The rails are welded by:
(a) Thermit welding (b) Gas welding
(c) Arc welding (d) MIG welding
Ans:- A
18. Steel sleepers are ..... shaped in section.
(a) oval (b) rectangular (c) trough (d) semi-spherical
Ans:- C
19. In India generally the sleeper density of sleepers per rail length used is:
(a) 18 (b) 30 (c) 12 (d) 24
Ans:- A
20. The extra rails provided over bridge to prevent damage and danger in case of derailment on the bridge are known as:
(a) Stock rails (b) Guard rails (c) Check rails (d) Wing rails
Ans:- B
21. The phenomenon of misalignment of rails due to temperature change is known as:
(a) cropping (b) creeping (c) bulging (d) buckling
Ans:- D
22. Creep is the ..... movement of rails.
(a) longitudinal (b) diagonal (c) horizontal (d) vertical
Ans:- A
23. Ballast best suited to steel sleepers is:
(a) sand (b) Gravel (c) Quartzite (d) All the above
Ans:- C
24. The section of a rail is decided on the basis of:
(a) Type of rails (b) Spacing of the sleepers
(c) Speed of trains (d) All of the above
Ans:- D
25. While preparing sub-grade of a railway line, the grubbing operation means:
(a) checking of subgrade
(b) filling or cutting of earth work in railway subgrade
(c) compaction and consolidation of earth work
(d) removal and disposal of stumps and roots trees
Ans:- D
26. The sinuous path taken by an engine as against the alignment of the track is known as:
(a) Rolling motion (b) Nosing motion
(c) Lurching motion (d) Vibration
Ans:- B
27. The mechanical device which transfer chemical energy of fuel into mechanical energy in the form of motion is called:
(a) rolling stock (b) railway (c) wagon (d) locomotive
Ans:- D
28. Integrated coach factory is located in:
(a) Chennai (b) Bangalore (c) Jamshedpur (d) Mumbai
Ans:- A
29. C.T.C. stands for:
(a) Critical Track Control
(b) Critical Traffic Channeliser
(c) Centralised Traffic Control
(d) None of these
Ans:- C
30. To reduce the intensity of pressure particularly on soft variety of sleepers, a rectangular plate is introduced between the rails and the sleepers. This is known as:
(a) Fish plate (b) Chair
(c) Saddle plate (d) Bearing plate
Ans:- D
31. Generally the rail sections used in India is:
(a) flat footed (b) double headed
(c) bull headed (d) all above
Ans:- A
32. The arrangement consisting of three tracks used for changing the direction of engine is called:
(a) three ladder track (b) turn table
(c) three throw switch (d) triangle
Ans:- B
33. The length of a wooden sleeper for broad gauge track is:
(a) 1.83 m (b) 1.52 m (c) 2.74 m (d) 1.676 m
Ans:- C
34. The technical officer of the rank of sectional officer in the maintenance organisation of Indian Railways is called:
(a) Permanent Way Inspector
(b) Gangmate
(c) Assistant Permanent Way Inspector
(d) None of these are correct
Ans:- C
35. The depth of ballast section under sleeper for broad gauge track as per Indian standard should be:
(a) 250 to 300 mm (b) 200 to 250 mm
(c) 150 to 200 mm (d) 150 mm
Ans:- B
36. The completed and finished railway line on which wheeled vehicles are drawn by locomotive is known as:
(a) steel way (b) rails (c) railway (d) permanent way
Ans:- D
37. The horse power to weight ratio steam engine is generally of the order of:
(a) 10-15 kg/HP (b) 60-80 kg/HP
(c) 20-30 kg/HP (d) 100-150 kg/HP
Ans:- B
38. The cause of formation of kinks in a rail is:
(a) Loose packing at joints
(b) Defect in gauge and alignment
(c) Defect in cross level joints
(d) Any of the above
Ans:- D
39. The horizontal distance from the material depot to the rail head is called:
(a) lift (b) site distance (c) rail-head (d) lead
Ans:- D
40. On curves, to counteract the effect of centrifugal force, the level of outer rail is raised above the inner rail by a certain amount. This is called:
(a) Track gradient (b) Track slope
(c) Super elevation (d) Horizontal gradient
Ans:- C
41. The measure of stiffness of track required to produce a unit depression in the track is known as:
(a) Tractive force (b) Load capacity
(c) Gauge (d) Track modulus
Ans:- D
42. The head of a gang in maintenance organisation of railway is called:
(a) P.W.I (b) Keyman (c) Ganger (d) A.P.W.I
Ans:- C
43. The fixed rail in a railway track against which the tongue rail fits s known as:
(a) wing rail (b) stock rail (c) lead rail (d) point rail
Ans:- B
44. The standard length of rail for Broad Gauge track in India is:
(a) 19.2 m (b) 25.6 m (c) 11.8 m (d) 12.8 m
Ans:- D
45. The thickness of fish plate generally used in Indian Railway is:
(a) 16 mm (b) 10 mm (c) 25 mm (d) 20 mm
Ans:- D
46. Thermal efficiency of a diesel engine may be expected to be in the range of:
(a) 50-65% (b) 25-35% (c) 15-20% (d) 10-15%
Ans:- B
47. Wear on top or head of rail occurs due to:
(a) Abrasion of rolling wheels
(b) Heavy axle load
(c) Constant brake application
(d) Any or all of the above
Ans:- D
48. Any movement of the locomotive in different planes, e.g., vertical, longitudinal, transversal etc., is known as:
(a) Oscillating motion (b) Lurching motion
(c) Shutting motion (d) Vibration
Ans:- A
49. In rainy season the dust in the ballast becomes mud and comes up by suction from below the rail joint. Such joint is called:
(a) Wet joint (b) Water joint
(c) Pumping joint (d) Blowing joint
Ans:- C
50. Accidents can be avoided by adopting:
(a) interlocking (b) C.T.C. system
(c) pilot guard system (d) A.T.C. system
Ans:- A
 
16th June 2011, 03:56 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

sir,please ...how do way prepare the r.r.b examination? and where to take the bits of r.r.b? and are you tell me some important book and some useful ways.....yours answer for waiting some time................
 
16th June 2011, 03:58 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

sir,please how do prepare to the r.r.b? and you have to tell the some important book.............
 
6th July 2011, 09:32 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

please send RRB exam syllabus for BE electrical
 
10th July 2011, 10:54 AM
fazlu
Member+
 
Join Date: Mar 2011
Posts: 257
Default Re: Model question papers fo RRB exam?

you can download the syllabus from the official website of that university.
www.mumbai.ac.in
 
6th September 2011, 01:52 AM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

i want to know the syllabus for RRB-exam & a mechanical student can appyl it or not?? please mail me at [email protected]
 
24th September 2011, 12:36 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

please send RRB exam syllabus for group D.& sir,please ...how do way prepare the r.r.b examination? and where to take the bits of r.r.b? and are you tell me some important book and some useful ways.....yours answer for waiting some time................
 
19th March 2012, 11:44 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

i want previous 5 year question papers of section engineer for electronics & telecomm
 
30th March 2012, 02:00 PM
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

Quote:
Originally Posted by unregistered View Post
sir,please ...how do way prepare the r.r.b examination? And where to take the bits of r.r.b? And are you tell me some important book and some useful ways.....yours answer for waiting some time................
sir,i m be ece student i also apply for rrb.so i need rrb molel questions paper.
 
1st April 2012, 03:29 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

Dear sir I have done DIPLOMA IN PLASTICS MOULDING TECHNOLOGY and my diploma syllebus is same as TOOL AND DIE MAKING DIPLOMA AND TOOL AND MACHINING related with mechanical diploma..can I apply for RRB for the post of JE. [email protected]

Regards
varinder singh
[email protected]
 
5th April 2012, 03:29 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

Sir, i need the syllabus for rrb exam 2012?i'm a B.E(ECE) degree holder of 2012?
 
21st April 2012, 11:45 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

already i registered but to download the attached file i asked for free registration, how can i use the previous registration
 
28th April 2012, 04:30 PM
sappogu shiva
Guest
 
Posts: n/a
Thumbs down Re: Model question papers fo RRB exam?

please send me some model qustions for rrb examination

Please reply

thanks
 
1st May 2012, 02:00 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

please send model question paper group c group d my email id [email protected]
 
2nd May 2012, 10:53 AM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

please send me rrb syllbus for electrical engineering and previous year question paper
 
13th May 2012, 11:31 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

pls send me the 150 questions of last taken exam of rrb group d
 
30th May 2012, 11:16 AM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

plz send me the 150 questions of last taken of rrb group d
 
30th May 2012, 03:30 PM
AIFRHM
 
Join Date: Apr 2012
Posts: 1
Default Re: Model question papers fo RRB exam?

sir,.


please send the detailed syllabus of railway recruitment borad group d exam
 
5th June 2012, 08:53 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

sir,


plz send me the deatailed syllabus of rrb exam n i have no idea ,student of m.sc.chemistry
 
6th June 2012, 10:53 AM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

please send the details of syllabus of r.r.b mechanical enggineering
 
6th June 2012, 12:46 PM
Shaenma
Senior Member+++++
 
Join Date: Mar 2011
Location: Howrah
Posts: 4,355
Default Re: Model question papers fo RRB exam?

I have uploaded some model question papers for you.
If you go through this then it will help you to get a better idea about the exam pattern and also the subjects to follow closely.
Prepare hard. All the best
Attached Files
File Type: pdf SET - E 1.pdf(161.7 KB, 1197 views)
File Type: pdf SET - E 2.pdf(161.9 KB, 1060 views)
File Type: pdf SET - E 3.pdf(162.0 KB, 830 views)
 
13th June 2012, 12:46 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

i want to model question papers in eee btech send my mail my mail id is [email protected]
 
13th June 2012, 02:25 PM
mink62
Junior Member
 
Join Date: Mar 2011
Posts: 3
Default Re: Model question papers fo RRB exam?

sir, i m a graduate in mechanical engineering.
i applied for the rrb that was opened recently...please do let me know anout the paper pattern & its syllabus...
and if possible please send me some of the last year papers or the sample papers for it!!
my id is : [email protected]...
 
13th June 2012, 02:31 PM
mink62
Junior Member
 
Join Date: Mar 2011
Posts: 3
Post Re: Model question papers fo RRB exam?

sir, i m a graduate in mechanical engineering.
i applied for the rrb that was opened recently...please do let me know anout the paper pattern & its syllabus...
and if possible please send me some of the last year papers or the sample papers for it!!
my id is : [email protected]...
 
2nd July 2012, 11:50 AM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

i want to model/question question papers in eee btech send my mail my mail id is [email protected]
 
2nd July 2012, 12:07 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

i want rrb-electrical all previous year question paper/model paper, my email id: [email protected]
 
2nd July 2012, 12:11 PM
kinkinkin
 
Join Date: Jul 2012
Posts: 2
Default Re: Model question papers fo RRB exam?

please send me previous year question and model papers for section engineer electrical enginering at my emial id ([email protected])
 
10th July 2012, 08:47 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

how to prepare law paper
 
15th July 2012, 05:43 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

i wanted soloved question papers of RRB exam
 
15th July 2012, 08:12 PM
samatha89
Member+
 
Join Date: Jul 2012
Posts: 556
Default Re: Model question papers fo RRB exam?

>> And this is inviting the various recruits many people for various post in Railway. And this is also conduct exam for selection for entrance exam .

>> The selection processor will be based on the entrance exam ,in that the you have the written test and personal interview and this exam is 2 hour and number of question 150 but some time it may be 120.

>>There are about 50% to 70% technical question from general knowledge, general mathematics and reasoning.

>> All questions are objective type each one have the one marks. there are also 1/3 negative marking for every wrong answer.

>> In non-tech. portion of question from English language and questions in the following subject areas such as;............

Technical subjects
Quantitative ability
Logical reasoning
General awareness
Language comprehension

>> After two or three months from written examination RRB publish their result on leading newspaper and on their website.there are more than 30% result as waiting list candidate also. There is no interview for the Section Engineer post. After one month from result declaration they call successful candidate for verification of documents.

all the best
 
2nd August 2012, 12:06 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

sir..how do i prepare for rrb pls reply me1my e-mail id is [email protected]
 
19th August 2012, 11:01 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

sir, plz reply for the syllabus and model question papers for RRB exams and also the study books.
[email protected]
 
30th August 2012, 08:35 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB asm

pleas send me modle paper railway exam to post of asm
 
31st August 2012, 03:41 PM
itsme.abhishek2012
Senior Member
 
Join Date: Aug 2012
Posts: 130
Default Re: Model question papers fo RRB exam?

HI dear,

>> And this is inviting the various recruits many people for various post in Railway. And this is also conduct exam for selection for entrance exam .

>> The selection processor will be based on the entrance exam ,in that the you have the written test and personal interview and this exam is 2 hour and number of question 150 but some time it may be 120.

>>There are about 50% to 70% technical question from general knowledge, general mathematics and reasoning.

>> All questions are objective type each one have the one marks. there are also 1/3 negative marking for every wrong answer.

>> In non-tech. portion of question from English language and questions in the following subject areas such as;............

Technical subjects
Quantitative ability
Logical reasoning
General awareness
Language comprehension

>> After two or three months from written examination RRB publish their result on leading newspaper and on their website.there are more than 30% result as waiting list candidate also. There is no interview for the Section Engineer post. After one month from result declaration they call successful candidate for verification of documents.

Thanks
 
31st August 2012, 05:24 PM
jacobs
Senior Member++++
 
Join Date: Oct 2011
Location: Kolkata
Posts: 2,455
Default Re: Model question papers fo RRB exam?



Dear friend,
Here I have attached some sample papers for RRB
I think these papers are good and will help you

:: SAMPLE PAPERS FOR RRB ::
Attached Files
File Type: pdf RRB_1.pdf(62.3 KB, 650 views)
File Type: pdf RRB_2.pdf(61.2 KB, 435 views)
File Type: pdf RRB_3.pdf(61.2 KB, 368 views)
File Type: pdf RRB_4.pdf(63.8 KB, 352 views)
File Type: pdf RRB_5.pdf(67.1 KB, 364 views)
 
1st September 2012, 12:11 AM
jayks
Senior Member
 
Join Date: Aug 2012
Posts: 300
Default Re: Model question papers fo RRB exam?

MODEL QUESTION PAPER FOR RRB

RRB syllabus and reference book and link

SYLLABUS::
1. General awareness
2. general intelligence
3. general english
4.Arithmetic ability
5. reasoning ability
6. technical ability


There is negative marking, 1/3 of the marks for each wrong answer.


You can use the following books as reference:-


-Railway(technical engineering cadre) Examination Guide by RPH Editorial Board.


-Guide to RRB Electrical engineering by GK Publisher.


-Guide to RRB electronics and telecommunication engg. by GK Publisher.


-Railway Civil Engineering Practice Workbook by Kiran Prakashan.


here below i have provided some links from where you get the papers;



http://www.jbigdeal.com/2010/06/rrb-...lved_3019.html
http://www.jbigdeal.com/2010/06/rrb-...lved-2006.html
http://www.jbigdeal.com/2010/06/rrb-...er-solved.html
http://www.jbigdeal.com/2010/06/rrb-...solved_29.html
http://www.jbigdeal.com/2010/11/rail...on-papers.html
http://www.jbigdeal.com/2010/06/rail...amination.html


find attached for Model paper.......
 
1st September 2012, 12:19 AM
archanagalenka
 
Join Date: Jun 2012
Posts: 408
Arrow Re: Model question papers fo RRB asm

Quote:
Originally Posted by Unregistered View Post
pleas send me modle paper railway exam to post of asm
Model Question Paper For RRB Exam :

1. The bent-up length of rail used in front of nose of crossing which help in channelising the train wheels in their proper routes are known as:
(a) lead rail (b) point rail (c) wing rail (d) splice rail
Ans:- C
2.The point up to which the new railway track laid, at any time is called:
(a) terminal (b) station (c) rail-head (d) base
Ans:- C
3.The good quality wood for sleeper is:
(a) Deodar (b) Sheesham (c) Teak (d) Sal
Ans:- C
4.Generally the life of wooden sleepers is taken as:
(a) 2 to 3 years (b) 12 to 15 years
(c) 35 to 50 years (d) 5 to 8 years
Ans:- B
5.The gradual or tapered widening of the flangeway which is formed by bending and splaying the end of check rail or wing rail away from the gauge line is known as:
(a) Flare (b) Toe (c) Heel (d) Loop
Ans:- A
6.The minimum height of embankment above the highest flood mark in the area should be:
(a) zero cm (b) 30 cm (c) 100 cm (d) 60 cm
Ans:- D
7.The recommended depth of ballast cushion on a curved portion of a track is provided under the ........ edge of the sleeper.
(a) upper (b) middle (c) inner (d) outer
Ans:- C
8. An outward slope provided on the tread of the wheel is:
(a) 1 in 5 (b) 1 in 10 (c) 1 in 20 (d) 1 in 25
Ans:- C
9.The granular material spread on the formation of a railway track for the sleepers to rest upon is known as:
(a) anchors (b) ballast (c) subgrade (d) chairs
Ans:- B
10.Bone shaped section of fish plate is commonly used for connecting:
(a) double headed rails (b) flat footed rails
(c) bull headed rails (d) all above are correct
Ans:- B
11.The members laid transversely under the rails for supporting and fixing them at the gauge distance apart are known as:
(a) fastenings (b) sleepers (c) ballast (d) fish plate
Ans:- B
12.The bottom width of foot in a flat footed rail is:
(a) 78.6 mm (b) 136.5 mm (c) 66.7 mm (d) 70 mm
Ans:- B
13.The rectangular pits in which wheels of the locomotives are taken out for repairs, are known as:
(a) Track pits (b) Inspection pits
(c) Drop pits (d) Siding pits
Ans:- C
14. The wheels are coned to prevent from rubbing the inside face of the rail head and to prevent lateral movement of the axle with its wheels. The slope of cone is:
(a) 1 in 5 (b) 1 in 20 (c) 1 in 10 (d) 1 in 15
Ans:- B
15. Gauge is the distance measured in place of the between which faces of two parallel rails in a track.
(a) inner faces
(b) centre line of one rail to inner face of other rail
(c) centre lines (d) outer faces
Ans:- A
16. Most significant which imposes limitations in raising the high speeds is:
(a) adhesion of wheels (b) resistance due to oscillations
(c) flange resistance (d) air or wind resistance
Ans:- A
17. The rails are welded by:
(a) Thermit welding (b) Gas welding
(c) Arc welding (d) MIG welding
Ans:- A
18. Steel sleepers are ..... shaped in section.
(a) oval (b) rectangular (c) trough (d) semi-spherical
Ans:- C
19. In India generally the sleeper density of sleepers per rail length used is:
(a) 18 (b) 30 (c) 12 (d) 24
Ans:- A
20. The extra rails provided over bridge to prevent damage and danger in case of derailment on the bridge are known as:
(a) Stock rails (b) Guard rails (c) Check rails (d) Wing rails
Ans:- B
21. The phenomenon of misalignment of rails due to temperature change is known as:
(a) cropping (b) creeping (c) bulging (d) buckling
Ans:- D
22. Creep is the ..... movement of rails.
(a) longitudinal (b) diagonal (c) horizontal (d) vertical
Ans:- A
23. Ballast best suited to steel sleepers is:
(a) sand (b) Gravel (c) Quartzite (d) All the above
Ans:- C
24. The section of a rail is decided on the basis of:
(a) Type of rails (b) Spacing of the sleepers
(c) Speed of trains (d) All of the above
Ans:- D
25. While preparing sub-grade of a railway line, the grubbing operation means:
(a) checking of subgrade
(b) filling or cutting of earth work in railway subgrade
(c) compaction and consolidation of earth work
(d) removal and disposal of stumps and roots trees
Ans:- D
26. The sinuous path taken by an engine as against the alignment of the track is known as:
(a) Rolling motion (b) Nosing motion
(c) Lurching motion (d) Vibration
Ans:- B
27. The mechanical device which transfer chemical energy of fuel into mechanical energy in the form of motion is called:
(a) rolling stock (b) railway (c) wagon (d) locomotive
Ans:- D
28. Integrated coach factory is located in:
(a) Chennai (b) Bangalore (c) Jamshedpur (d) Mumbai
Ans:- A
29. C.T.C. stands for:
(a) Critical Track Control
(b) Critical Traffic Channeliser
(c) Centralised Traffic Control
(d) None of these
Ans:- C
30. To reduce the intensity of pressure particularly on soft variety of sleepers, a rectangular plate is introduced between the rails and the sleepers. This is known as:
(a) Fish plate (b) Chair
(c) Saddle plate (d) Bearing plate
Ans:- D
31. Generally the rail sections used in India is:
(a) flat footed (b) double headed
(c) bull headed (d) all above
Ans:- A
32. The arrangement consisting of three tracks used for changing the direction of engine is called:
(a) three ladder track (b) turn table
(c) three throw switch (d) triangle
Ans:- B
33. The length of a wooden sleeper for broad gauge track is:
(a) 1.83 m (b) 1.52 m (c) 2.74 m (d) 1.676 m
Ans:- C
34. The technical officer of the rank of sectional officer in the maintenance organisation of Indian Railways is called:
(a) Permanent Way Inspector
(b) Gangmate
(c) Assistant Permanent Way Inspector
(d) None of these are correct
Ans:- C
35. The depth of ballast section under sleeper for broad gauge track as per Indian standard should be:
(a) 250 to 300 mm (b) 200 to 250 mm
(c) 150 to 200 mm (d) 150 mm
Ans:- B
36. The completed and finished railway line on which wheeled vehicles are drawn by locomotive is known as:
(a) steel way (b) rails (c) railway (d) permanent way
Ans:- D
37. The horse power to weight ratio steam engine is generally of the order of:
(a) 10-15 kg/HP (b) 60-80 kg/HP
(c) 20-30 kg/HP (d) 100-150 kg/HP
Ans:- B
38. The cause of formation of kinks in a rail is:
(a) Loose packing at joints
(b) Defect in gauge and alignment
(c) Defect in cross level joints
(d) Any of the above
Ans:- D
39. The horizontal distance from the material depot to the rail head is called:
(a) lift (b) site distance (c) rail-head (d) lead
Ans:- D
40. On curves, to counteract the effect of centrifugal force, the level of outer rail is raised above the inner rail by a certain amount. This is called:
(a) Track gradient (b) Track slope
(c) Super elevation (d) Horizontal gradient
Ans:- C
41. The measure of stiffness of track required to produce a unit depression in the track is known as:
(a) Tractive force (b) Load capacity
(c) Gauge (d) Track modulus
Ans:- D
42. The head of a gang in maintenance organisation of railway is called:
(a) P.W.I (b) Keyman (c) Ganger (d) A.P.W.I
Ans:- C
43. The fixed rail in a railway track against which the tongue rail fits s known as:
(a) wing rail (b) stock rail (c) lead rail (d) point rail
Ans:- B
44. The standard length of rail for Broad Gauge track in India is:
(a) 19.2 m (b) 25.6 m (c) 11.8 m (d) 12.8 m
Ans:- D
45. The thickness of fish plate generally used in Indian Railway is:
(a) 16 mm (b) 10 mm (c) 25 mm (d) 20 mm
Ans:- D
46. Thermal efficiency of a diesel engine may be expected to be in the range of:
(a) 50-65% (b) 25-35% (c) 15-20% (d) 10-15%
Ans:- B
47. Wear on top or head of rail occurs due to:
(a) Abrasion of rolling wheels
(b) Heavy axle load
(c) Constant brake application
(d) Any or all of the above
Ans:- D
48. Any movement of the locomotive in different planes, e.g., vertical, longitudinal, transversal etc., is known as:
(a) Oscillating motion (b) Lurching motion
(c) Shutting motion (d) Vibration
Ans:- A
49. In rainy season the dust in the ballast becomes mud and comes up by suction from below the rail joint. Such joint is called:
(a) Wet joint (b) Water joint
(c) Pumping joint (d) Blowing joint
Ans:- C
50. Accidents can be avoided by adopting:
(a) interlocking (b) C.T.C. system
(c) pilot guard system (d) A.T.C. system
Ans:- A
 
19th September 2012, 07:15 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

please send me rrb model question papers from my email id [email protected]
 
5th October 2012, 12:02 AM
sandeep912
Junior Member
 
Join Date: Oct 2012
Location: mumbai
Posts: 1
Default Re: Model question papers fo RRB exam?

Quote:
Originally Posted by jacobs View Post


Dear friend,
Here I have attached some sample papers for RRB
I think these papers are good and will help you

:: SAMPLE PAPERS FOR RRB ::
Files are not getting open
 
28th November 2012, 03:23 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

sir rrb ntpc graduate how 2 prepare?
 
2nd September 2013, 05:19 PM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

Commercial clerk exam books
 
24th July 2014, 03:10 AM
Unregistered
Guest
 
Posts: n/a
Default Re: Model question papers fo RRB exam?

please send the detailed syllabus of railway recruitment borad group d exam
i am deaf. my email [email protected]
 
Do you have any question? or have anything to say?



Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.3.0
Please also check: