Railway Engineering Exam Solved Questions:
1. The limiting value of super elevation of board gauge in Indian Railways is: (a) 16.50 cm (b) 30 cm (c) 15 cm (d) 10 cm Ans : A 2. Which of the following is not a part of rail engine? (a) Tender (b) Stream turbine (c) Boiler (d) Fire box Ans : B 3. The staggered rails joints are usually provided on: (a) Bridge (b) Curves (c) Branching (d) Tangents Ans : B 4. In broad gauge, the clear horizontal distance between the inner faces of two parallel rails forming the track is: (a) 1 m (b) 1.676 m (c) 0.6096 m (d) 0.792 m Ans : B 5. Generally the shape of fish plate is: (a) elliptical (b) bone shaped (c) circular (d) rectangular Ans : B 6. The track capacity can be increased by: (a) Faster movement of trains on the track (b) By using more powerful engines (c) All the above (d) None of the above Ans : C 7. Detonating signals are used: (a) for noisy engines (b) during foggy and cloudy weather (c) for deaf drivers (d) not now, were in use in nineteenth century only Ans : B 8. Wider gauge permits: (a) sleeper gradients (b) low axle load (c) higher operating speeds (d) sharp curves Ans : C 9. The railway station at which a track line meets a main line is called: (a) terminal station (b) flag station (c) way side station (d) junction station Ans : D 10. Points and crossings are provided for change of .on permanent ways. (a) gauge (b) direction and gradient (c) direction (d) gradient Ans : C 11. The chart used for recording the condition of track is known as: (a) Rolling chart (b) Track chart (c) Hallade chart (d) Vibro chart Ans: C 12. The most common system of signaling in India is the system. (a) automatic block (b) section clear system (c) absolute block (d) pilot guard system Ans : C 13. The feeder gauge . is commonly used for feeding raw materials to big Government manufacturing concerns as well as to private factories such as steel plants, oil refineries, sugar factories etc. (a) 0.6096 m (b) 0.792 m (c) 1m (d) 1.676 m Ans : A 14. A parabolic curve introduced between straight and a circular curve or between two branches of a compound curve for ease, comfort and safety of movement of trains on curve is called: (a) Spur curve (b) Transition curve (c) Summit curve (d) Valley curve Ans : B 15. The railway track from which a train is to be diverted is called: (a) branch track (b) points and crossing (c) main or through track (d) all above Ans : C 16. An expansion gap of . is usually kept between the adjoining rail ends to allow for expansion of rail, due to variation in temperature. (a) 1 to 3 mm (b) 10 to 15 mm (c) 6 to 8 mm (d) 3 to 5 mm Ans : C 17. Which one of the following bolts is not used in rail track: (a) Fang bolt (b) Eye bolt (c) Rag bolt (d) Fish bolt Ans : B 18. The gradient which requires one or more additional locomotive for hauling the load over the gradient is called: (a) Up-gradient (b) Pusher gradient (c) Steep gradient (d) Momentum gradient Ans : B 19. In locomotive hunting is: (a) Movement of locomotive in vertical plane perpendicular to its movement along the track (b) Sinuous path taken by engine as against the alignment of the track (c) Motion after brakes have been applied (d) Combination of A and B above Ans : D 20. The rails which get battered due to action of wheels over the end of the rails are called: (a) Hogged rails (b) Roaring rails (c) Creep rails (d) Bucking rails Ans : A 21. As per Indian standard, the recommended width of ballast section at foot level of rails for broad gauge tracks should be: (a) 4.38 m (b) 3.35 m (c) 1.83 m (d) 2.25 m Ans : B 22. The minimum length of a passenger platform for broad gauge railway should not be less than: (a) 305 m (b) 183 m (c) 495 m (d) 250 m Ans : A 23. For wooden sleepers, size of the ballast should be: (a) 2.54 cm (b) 10.16 cm (c) 3.8 cm (d) 5.1 cm Ans : C 24. The length of track under the control of a Ganger is: (a) 10 to 15 Km (b) 5 to 6 KM (c) 3 to 5 KM (d) 1 to 2 KM Ans : B 25. The maximum rising gradient which is provided keeping the power of locomotive in view, is called (a) Momentum gradient (b) Pusher gradient (c) Down gradient (d) Ruling gradient Ans : D 26. The latest system of signaling introduced is: (a) C.T.C. system (b) pilot guard system (c) section clear system (d) automatic block system Ans : A 27. The maximum gradient for broad gauge in station yards in Indian Railways is: (a) 1 in 100 (b) 1 in 1000 (c) 1in 200 (d) 1 in 400 Ans : D 28. The force which resists the forward movement and speed of train is called: (a) Track modulus (b) Hauling resistance (c) friction (d) Tractive resistance Ans : D 29. The number of fish bolts used for joining the rails with the help of fish plates, is generally: (a) 4 (b) 8 (c) 2 (d) 6 Ans : A 30. The Railways provided underground at a depth of about 18 m or more are called: (a) Mono railway (b) Underground railway (c) Railway (d) Tube railway Ans : D 31. The creep in rails is measured in: (a) cm/kg (b) cm (c) Kg/cm (d) kg cm Ans : B 32. The art of providing an outward slope of . to the treads of wheels of rolling stock is known as coning of wheels. (a) 1 in 30 (b) 1 in 10 (c) 1 in 4 (d) 1 in 20 Ans : D 33. The process of connecting a track length by an electric circuit is known as track circuiting and the sleepers which are suitable for it are: (a) cast iron sleepers (b) steel sleepers (c) wooden sleepers (d) all above are suitable Ans : C 34. The yard where trains and other loads are received, sorted out, trains formed and dispatched onwards are known as: (a) locomotive yard (b) goods yard (c) marshalling yard (d) station yard Ans : C 35. Which one of the following is expected to have shorter life? (a) Steam engine (b) Diesel engine (c) Electric engine (d) Shunting engine And : B 36. The movable end of the tapered rail, by means of which the flanged wheels of the train are diverted from one track to another is known as: (a) Toe (b) Stud (c) Heel (d) Flare Ans : A 37. When a rail loses its weight by 5%, it should be renewed and the old one can be used on unimportant tracks, but the rails which have lost their weight by more than ., should not be used on any track under any circumstances. (a) 8% (b) 33.3% (c) 10% (d) 20% Ans : C 38. A dynamometer car is used for: (a) Tourists (b) Dinning facilities (c) Inspection of administrative officers (d) Recording the condition of track Ans : D 39. When a railway line crosses a valley, a ridge like structure consisting of a series of piers, piles or trestles on which steel girders are placed and which is constructed usually for small spans is known as: (a) Bridge (b) Tunnel (c) Viaduct (d) Aqueduct Ans : C 40. The movable tapered end of the tongue rail is known as: (a) heel of switch (b) toe of switch (c) stretcher bar (d) throw of switch Ans : B 41. In railways, super elevation is provided to: (a) facilitate drainage (b) counteract the centrifugal push (c) counteract the centripetal pull (d) have all the effects mentioned above Ans : B 42. The rails which help in channelising the wheels in their proper routes are known as: (a) Guard rails (b) Wing rails? (c) Check rails (d) Lead rails Ans : B 43. The shape of wheels of rolling stock is: (a) Tapered with flange on outside (b) Parallel with flange on inside (c) Tapered with flange on inside (d) Parallel with flange on outside Ans : C 44. The tractive resistance of the route in railways as compared to roadways will be: (a) same (b) more (c) low (d) not comparable Ans : C 45. Sand is used as ballast incase of: (a) steel sleepers (b) wooden sleepers (c) reinforced concrete sleepers (d) cast iron sleepers Ans : D 46. Arm type fixed signals, fitted on a vertical post fixed at the side of a track, are called: (a) Warner signals (b) Starter signals (c) Semaphore signals (d) Cab signals Ans : C 47. The Railway provided just below the ground level are called: (a) Tube railway (b) Underground railway (c) Mono railway (d) Railway Ans : B 48. Creeping of rails will be reduced by using: (a) Bearing plates (b) Spikes (c) Chairs (d) Anchors Ans : D 49. Generally the weight/metre of the rails used in broad gauge is: (a) 55 kg (b) 45 kg (c) 35 kg (d) 65 kg Ans : A 50. The additional track connected to main line at both of its ends is called: (a) running line (b) loop line (c) main line (d) none are correct Ans : B |
#3
28th February 2011, 08:44 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
refer these links
http://education.latestt.com/questio...uestion-Papers www.rrbbhopal.gov.in |
#9
13th April 2012, 07:39 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
|
#10
13th April 2012, 10:40 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
sir please send me previous year qus paper for section engg, civil engg.
mail id: [email protected] |
#11
15th April 2012, 06:25 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
|
#13
21st April 2012, 02:33 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
PLZ send me the syllabus of junior engg (Instrumentation) exams and solved question papers for last five years Junior Engineer Track Machine mail id; [email protected] |
#14
22nd April 2012, 11:26 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
plz send me last 5 year question papers of RRB exam Junior Engineer electronics and communication
mail id : [email protected] |
#15
24th April 2012, 12:42 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
please,
Send me the syllabus for track machine in RRB and also 5 years solved sample paper for its preparation. Mail I.D. [email protected] |
#16
24th April 2012, 12:45 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
please send me the syllabus of track machine in rrb and also 5 years solved question paper for my best preparation.
mail I.D. [email protected] |
#19
27th April 2012, 03:42 AM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
plz send me the syllabus of junior engg (mechanical) exams andsolved question papers for last five years, my e-maol [email protected]
|
#20
29th April 2012, 11:44 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
Sir,
I am preparing for rrb je mechanical exam. please send me previous years papers at [email protected] thanking you, anuj kumar |
#21
1st May 2012, 03:03 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
sir, i am preapear for exam of rrb junior engineer civil, so please send me previous 5year's question paper at my id. my id is ([email protected])
|
#22
8th May 2012, 12:18 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
sir pls give me the solved paper of JE TRACK MACHINE of last five year.
my eMAIL ID IS [email protected] |
#24
16th May 2012, 10:58 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
Sir, please send last five years question of railway je of civil branch & syllabus 2012.
email [email protected] |
#26
23rd May 2012, 02:41 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
|
#28
10th June 2012, 08:13 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
Sir, please send last five years question of railway je of civil branch & syllabus 2012.
Source: http://entrance-exam.net/forum/general-discussion/last-5-year-question-papers-rrb-exam-junior-engineer-ii-track-machine-59104.html#ixzz1xOTspurc |
#30
11th June 2012, 08:01 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
hi dear friend,
Railway Engineering Exam Solved Questions: 1. The limiting value of super elevation of board gauge in Indian Railways is: (a) 16.50 cm (b) 30 cm (c) 15 cm (d) 10 cm Ans : A 2. Which of the following is not a part of rail engine? (a) Tender (b) Stream turbine (c) Boiler (d) Fire box Ans : B 3. The staggered rails joints are usually provided on: (a) Bridge (b) Curves (c) Branching (d) Tangents Ans : B 4. In broad gauge, the clear horizontal distance between the inner faces of two parallel rails forming the track is: (a) 1 m (b) 1.676 m (c) 0.6096 m (d) 0.792 m Ans : B 5. Generally the shape of fish plate is: (a) elliptical (b) bone shaped (c) circular (d) rectangular Ans : B 6. The track capacity can be increased by: (a) Faster movement of trains on the track (b) By using more powerful engines (c) All the above (d) None of the above Ans : C 7. Detonating signals are used: (a) for noisy engines (b) during foggy and cloudy weather (c) for deaf drivers (d) not now, were in use in nineteenth century only Ans : B 8. Wider gauge permits: (a) sleeper gradients (b) low axle load (c) higher operating speeds (d) sharp curves Ans : C 9. The railway station at which a track line meets a main line is called: (a) terminal station (b) flag station (c) way side station (d) junction station Ans : D 10. Points and crossings are provided for change of .on permanent ways. (a) gauge (b) direction and gradient (c) direction (d) gradient Ans : C 11. The chart used for recording the condition of track is known as: (a) Rolling chart (b) Track chart (c) Hallade chart (d) Vibro chart Ans: C 12. The most common system of signaling in India is the system. (a) automatic block (b) section clear system (c) absolute block (d) pilot guard system Ans : C 13. The feeder gauge . is commonly used for feeding raw materials to big Government manufacturing concerns as well as to private factories such as steel plants, oil refineries, sugar factories etc. (a) 0.6096 m (b) 0.792 m (c) 1m (d) 1.676 m Ans : A 14. A parabolic curve introduced between straight and a circular curve or between two branches of a compound curve for ease, comfort and safety of movement of trains on curve is called: (a) Spur curve (b) Transition curve (c) Summit curve (d) Valley curve Ans : B 15. The railway track from which a train is to be diverted is called: (a) branch track (b) points and crossing (c) main or through track (d) all above Ans : C 16. An expansion gap of . is usually kept between the adjoining rail ends to allow for expansion of rail, due to variation in temperature. (a) 1 to 3 mm (b) 10 to 15 mm (c) 6 to 8 mm (d) 3 to 5 mm Ans : C 17. Which one of the following bolts is not used in rail track: (a) Fang bolt (b) Eye bolt (c) Rag bolt (d) Fish bolt Ans : B 18. The gradient which requires one or more additional locomotive for hauling the load over the gradient is called: (a) Up-gradient (b) Pusher gradient (c) Steep gradient (d) Momentum gradient Ans : B 19. In locomotive hunting is: (a) Movement of locomotive in vertical plane perpendicular to its movement along the track (b) Sinuous path taken by engine as against the alignment of the track (c) Motion after brakes have been applied (d) Combination of A and B above Ans : D 20. The rails which get battered due to action of wheels over the end of the rails are called: (a) Hogged rails (b) Roaring rails (c) Creep rails (d) Bucking rails Ans : A 21. As per Indian standard, the recommended width of ballast section at foot level of rails for broad gauge tracks should be: (a) 4.38 m (b) 3.35 m (c) 1.83 m (d) 2.25 m Ans : B 22. The minimum length of a passenger platform for broad gauge railway should not be less than: (a) 305 m (b) 183 m (c) 495 m (d) 250 m Ans : A 23. For wooden sleepers, size of the ballast should be: (a) 2.54 cm (b) 10.16 cm (c) 3.8 cm (d) 5.1 cm Ans : C 24. The length of track under the control of a Ganger is: (a) 10 to 15 Km (b) 5 to 6 KM (c) 3 to 5 KM (d) 1 to 2 KM Ans : B 25. The maximum rising gradient which is provided keeping the power of locomotive in view, is called (a) Momentum gradient (b) Pusher gradient (c) Down gradient (d) Ruling gradient Ans : D 26. The latest system of signaling introduced is: (a) C.T.C. system (b) pilot guard system (c) section clear system (d) automatic block system Ans : A 27. The maximum gradient for broad gauge in station yards in Indian Railways is: (a) 1 in 100 (b) 1 in 1000 (c) 1in 200 (d) 1 in 400 Ans : D 28. The force which resists the forward movement and speed of train is called: (a) Track modulus (b) Hauling resistance (c) friction (d) Tractive resistance Ans : D 29. The number of fish bolts used for joining the rails with the help of fish plates, is generally: (a) 4 (b) 8 (c) 2 (d) 6 Ans : A 30. The Railways provided underground at a depth of about 18 m or more are called: (a) Mono railway (b) Underground railway (c) Railway (d) Tube railway Ans : D 31. The creep in rails is measured in: (a) cm/kg (b) cm (c) Kg/cm (d) kg cm Ans : B 32. The art of providing an outward slope of . to the treads of wheels of rolling stock is known as coning of wheels. (a) 1 in 30 (b) 1 in 10 (c) 1 in 4 (d) 1 in 20 Ans : D 33. The process of connecting a track length by an electric circuit is known as track circuiting and the sleepers which are suitable for it are: (a) cast iron sleepers (b) steel sleepers (c) wooden sleepers (d) all above are suitable Ans : C 34. The yard where trains and other loads are received, sorted out, trains formed and dispatched onwards are known as: (a) locomotive yard (b) goods yard (c) marshalling yard (d) station yard Ans : C 35. Which one of the following is expected to have shorter life? (a) Steam engine (b) Diesel engine (c) Electric engine (d) Shunting engine And : B 36. The movable end of the tapered rail, by means of which the flanged wheels of the train are diverted from one track to another is known as: (a) Toe (b) Stud (c) Heel (d) Flare Ans : A 37. When a rail loses its weight by 5%, it should be renewed and the old one can be used on unimportant tracks, but the rails which have lost their weight by more than ., should not be used on any track under any circumstances. (a) 8% (b) 33.3% (c) 10% (d) 20% Ans : C 38. A dynamometer car is used for: (a) Tourists (b) Dinning facilities (c) Inspection of administrative officers (d) Recording the condition of track Ans : D 39. When a railway line crosses a valley, a ridge like structure consisting of a series of piers, piles or trestles on which steel girders are placed and which is constructed usually for small spans is known as: (a) Bridge (b) Tunnel (c) Viaduct (d) Aqueduct Ans : C 40. The movable tapered end of the tongue rail is known as: (a) heel of switch (b) toe of switch (c) stretcher bar (d) throw of switch Ans : B 41. In railways, super elevation is provided to: (a) facilitate drainage (b) counteract the centrifugal push (c) counteract the centripetal pull (d) have all the effects mentioned above Ans : B 42. The rails which help in channelising the wheels in their proper routes are known as: (a) Guard rails (b) Wing rails? (c) Check rails (d) Lead rails Ans : B 43. The shape of wheels of rolling stock is: (a) Tapered with flange on outside (b) Parallel with flange on inside (c) Tapered with flange on inside (d) Parallel with flange on outside Ans : C 44. The tractive resistance of the route in railways as compared to roadways will be: (a) same (b) more (c) low (d) not comparable Ans : C 45. Sand is used as ballast incase of: (a) steel sleepers (b) wooden sleepers (c) reinforced concrete sleepers (d) cast iron sleepers Ans : D 46. Arm type fixed signals, fitted on a vertical post fixed at the side of a track, are called: (a) Warner signals (b) Starter signals (c) Semaphore signals (d) Cab signals Ans : C 47. The Railway provided just below the ground level are called: (a) Tube railway (b) Underground railway (c) Mono railway (d) Railway Ans : B 48. Creeping of rails will be reduced by using: (a) Bearing plates (b) Spikes (c) Chairs (d) Anchors Ans : D 49. Generally the weight/metre of the rails used in broad gauge is: (a) 55 kg (b) 45 kg (c) 35 kg (d) 65 kg Ans : A 50. The additional track connected to main line at both of its ends is called: (a) running line (b) loop line (c) main line (d) none are correct Ans : B thanks |
#32
10th July 2012, 02:51 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
pls send for this mail id:[email protected] |
#33
10th July 2012, 03:01 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
|
#34
2nd August 2012, 10:47 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
wasim khan.............................................. .................................................. .................................................. .................................................. .............
|
#35
3rd August 2012, 02:20 AM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
Quote:
I have attached the question papers pertaining to junior engineer track machine. I hope it will help you. Good luck |
#36
13th August 2012, 09:35 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
Quote:
sir send me the track machine jr engg question papers for me also mailid - [email protected] |
#37
14th August 2012, 11:56 AM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
please send last 5 year question papers of rrb exam junior engineer track machine on
[email protected] |
#38
15th August 2012, 11:08 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
junior engineer for trrack machine previous question papers and genderal studies papers plz send my mail id
[email protected] |
#39
16th August 2012, 12:39 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
Pls send me last five years question & answer papers of RRB exam junior engineer-II track machine?
Please help send me [email protected] |
#40
16th August 2012, 05:12 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
|
#42
17th August 2012, 12:18 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
|
#44
21st August 2012, 12:06 AM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
dear all
i requst pls send me the previous year question paper for the post of JE(track machine) on mail id [email protected] |
#46
21st August 2012, 08:23 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
pls send me the previous year question paper for the post of JE(track machine) on mail id [email protected]
|
#47
22nd August 2012, 01:55 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
sir i want syllabus and previous year question paperof RRB JUNIOR ENGNEER INFORMATION TECHNOLOGY. My email id is
[email protected] |
#48
22nd August 2012, 10:08 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
Hello sir please send me the question papers of junior engineer (Track machine)...to this [email protected]
|
#49
23rd August 2012, 03:04 AM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
sir,
plz send last five year question paper for je(track machine) in RRB. My mail id is [email protected] |
#50
23rd August 2012, 07:13 PM
|
|||
|
|||
Re: Last 5 year question papers of RRB exam Junior Engineer II Track Machine?
sir please send me the previous question papers of junior engineer TRACK MACHINE to my mail [email protected]
|
Related Topics: |
||
Thread | Replies | Last Post |
Junior Engineer GR II Syllabus? | 13 | 19th July 2013 12:29 AM |
|